top of page

IQPC Service technician will carry out the initial inspection of the premises. The measurement of the service area will be taken. The material from the wall and floor area has to be cleared. The machine used for drilling (Pneumatic Hammer Drill) and drill bit of 12 mm dia will be fixed into the chuck. The coil of the drilling machine is plugged and the drilling work is carried out.

 

The holes are drilled at one-foot interval and drilling is carried out at 45-degree angle so as to reach the soil.The dust from the holes are cleaned by using brush and the dust collected is disposed in the waste bin. The chemical of Imidacloprid of 2.1 ml is taken in the measuring jar and added to the 5 Liter. Hand compression pump water is added to maintain the level of 5 Liter. and closed with the lid to make it airtight.

 

The pressure is induced inside the pump by pumping the compressor. The chemical emulsion is injected by way of nozzle of the pump with pressure at the rate of 150-200 ml per hole. Continuous chemical barrier is created so as to prevent the termite infestation. Then the holes are sealed with sand and white cement to match the existing colour.

IQ termite management 
bottom of page